Building 9
There have been a few delays with weather and things but plan is to pour the slab Monday/Tuesday June 1 and 2.
Building 5
Estimate from the Builder is Final Faming Inspection the week of June 15-19.
Electrical is mostly done and drywall backing is being installed for fireplace installation.
Building 8
Ground floor patios have been poured. Rough plumbing is underway.